− | [[File:Throughput_of_convergent_assembly_-_annotated.svg|400px|thumb|right|In first approximation it's always one single layer of sub-assembly-level-cells below the current assembly-level-cell that has matching throughput.(Independent of step-size). When there are deviations such that lower layers are slower than the first approximation suggests then identical layers can be stacked for compensation.<br>Q...throughput – s...side-length – f...frequency]] | + | [[File:Throughput_of_convergent_assembly_-_annotated.svg|400px|thumb|right|In first approximation it's always one single layer of sub-assembly-level-cells below the current assembly-level-cell that has matching throughput.(Independent of step-size). When there are deviations such that lower layers are slower than the first approximation suggests then identical layers can be stacked for compensation.<br>Q...throughput – s...side-length – f...frequency – (step-size = [[branching factor]])]] |
In advanced [[nanofactory|gem-gum factories]] the production and consumption rates of the meeting [[assembly levels]] should roughly fit together such that no bottlenecks are present. | In advanced [[nanofactory|gem-gum factories]] the production and consumption rates of the meeting [[assembly levels]] should roughly fit together such that no bottlenecks are present. | ||
+ | |||
+ | Exceptions: [[Desirable deviations from continuity of throughput]] | ||
= Chaining/(stacking) of equal assembly levels/(layers) for mismatch compensation = | = Chaining/(stacking) of equal assembly levels/(layers) for mismatch compensation = | ||
Line 7: | Line 9: | ||
To compensate for mismatches of the throughput of the assembly cells of specific size levels one can chain together several of the same assembly levels with transport paths running along. | To compensate for mismatches of the throughput of the assembly cells of specific size levels one can chain together several of the same assembly levels with transport paths running along. | ||
− | In case the [[assembly levels]] are implemented as [[assembly layers]] the chaining concretises to stacking and the transport paths become vertical shafts going up through the homogeneous layer stack. | + | In case the [[assembly levels]] are implemented as [[assembly layers]] the chaining concretises to stacking and the transport paths become vertical shafts going up through the homogeneous layer stack. <br>See: [[Sub-layer]]s |
− | This chaining/stacking approach works only as long as transport up the stack is can be | + | This chaining/stacking approach works only as long as transport up the stack is can be slower than the assembly in the stack which is especially true for the bottommost assembly layers. <br>{{todo|check for upper layers}} <br> |
+ | See: [[Optimal sublayernumber for minimal friction]] | ||
− | Effects on larger scales that may influence compensatability of throughput mismatches are: | + | Effects on larger scales that may influence the compensatability of throughput mismatches are: |
− | * [[infinitesimal bearing]]s reducing friction in a scaling law | + | * [[infinitesimal bearing]]s reducing friction in a way that changes the scaling law for bearing friction by one power. |
− | * Streaming style assembly (details further down) – (delaying scaling law?) | + | * Lower friction of larger [[atomically precise roller gearbearing]]s – [[Mesoscale bearing friction]] |
+ | * [[Part streaming assembly|Streaming style assembly]] (details further down) – (delaying scaling law?) | ||
* Low (energy carrying) surface area per assembled volume leading to easier achievable high efficiency assembly and disassembly. | * Low (energy carrying) surface area per assembled volume leading to easier achievable high efficiency assembly and disassembly. | ||
− | * The [[Unsupported rotating ring speed limit|fundamental speed limit]]. But average operation likely won't come near that. | + | * The [[Unsupported rotating ring speed limit|fundamental speed limit]]. But average operation likely won't come anywhere near that. |
= Accepted or even desired mismatch = | = Accepted or even desired mismatch = | ||
Line 28: | Line 32: | ||
= Factors determining throughput rates for individual assembly level chambers = | = Factors determining throughput rates for individual assembly level chambers = | ||
− | To match the the throughput of the assembly levels one needs | + | To match the the throughput of the assembly levels one needs at least a rough estimate of the <br> |
− | actual the production rates of the assembly levels of advanced [[nanofactory|gem-gum factories]]. | + | actual the production rates of the assembly levels of advanced [[nanofactory|gem-gum factories]]. <br> |
− | + | Production rates on several factors. Some listed in the following. <br> | |
Note: orthogonality aka mutual independence is not guaranteed! | Note: orthogonality aka mutual independence is not guaranteed! | ||
Line 83: | Line 87: | ||
* '''[[Branching factor]]''' | * '''[[Branching factor]]''' | ||
+ | * '''[[Math of convergent assembly]]''' | ||
* [[Deliberate slowdown at the lowest assembly level]] | * [[Deliberate slowdown at the lowest assembly level]] | ||
* Level throughput balancing is an aspect of [[advanced nanofactory design]]. | * Level throughput balancing is an aspect of [[advanced nanofactory design]]. | ||
* [[Higher productivity of smaller machinery]] | * [[Higher productivity of smaller machinery]] | ||
− | * [[Limits to higher | + | * [[Limits to lower friction despite higher bearing area]] |
* [[Convergent assembly]] & [[Assembly levels]] | * [[Convergent assembly]] & [[Assembly levels]] | ||
* [[Scaling law]]s | * [[Scaling law]]s |
Latest revision as of 08:44, 5 September 2022
In advanced gem-gum factories the production and consumption rates of the meeting assembly levels should roughly fit together such that no bottlenecks are present.
Exceptions: Desirable deviations from continuity of throughput
Contents
Chaining/(stacking) of equal assembly levels/(layers) for mismatch compensation
To compensate for mismatches of the throughput of the assembly cells of specific size levels one can chain together several of the same assembly levels with transport paths running along.
In case the assembly levels are implemented as assembly layers the chaining concretises to stacking and the transport paths become vertical shafts going up through the homogeneous layer stack.
See: Sub-layers
This chaining/stacking approach works only as long as transport up the stack is can be slower than the assembly in the stack which is especially true for the bottommost assembly layers.
(TODO: check for upper layers)
See: Optimal sublayernumber for minimal friction
Effects on larger scales that may influence the compensatability of throughput mismatches are:
- infinitesimal bearings reducing friction in a way that changes the scaling law for bearing friction by one power.
- Lower friction of larger atomically precise roller gearbearings – Mesoscale bearing friction
- Streaming style assembly (details further down) – (delaying scaling law?)
- Low (energy carrying) surface area per assembled volume leading to easier achievable high efficiency assembly and disassembly.
- The fundamental speed limit. But average operation likely won't come anywhere near that.
Accepted or even desired mismatch
In the case throughput capacity monotonously increases with rising assembly levels it can at least speed up recycling where the old products don't go down all the way the convergent assembly stack. This situation could appear if a throughput capacity rise in the larger scales can't be compensated by chaining/stacking of the lower levels/layers.
A drop in throughput capacity with rising assembly levels is harder to justify. Pre-assembled matter memory "caches" that convert themselves back and forth but partially never reach macroscopic dimensions may be a motivation.
It's hard to guess where in the stack the demands (lower bounds) will first push at the physical limitations (upper bounds).
Factors determining throughput rates for individual assembly level chambers
To match the the throughput of the assembly levels one needs at least a rough estimate of the
actual the production rates of the assembly levels of advanced gem-gum factories.
Production rates on several factors. Some listed in the following.
Note: orthogonality aka mutual independence is not guaranteed!
Density in space
The density of operational spots of the assembly method.
Hard-coded mill style (spots are dense) or general purpose manipulator style (spots are sparse).
Density in time
Dissipation power (depending on operation speed) and cooling system capacity.
On the lowest levels surface area increases thus one might want to slow down a bit.
Step-size of convergent assembly
The step sub-product sizes between the assembly layers ("step size"). How many small parts will be assembled to a big one.
Streaming assembly robotics
Especially in the bigger assembly chambers that lie in the higher assembly levels it becomes possible to do "streaming". First one merges the incoming small building parts into a single stream and then one feeds this stream through moving hinges in the assembly robotics one delivers the parts to their destination in the block the next assembly level up.
Note that the merging of streams (between assembly levels) in the bigger size range (towards macro) is not not for ordering. At these levels the parts can already be produced in the right order making reordering unnecessary.
Even snake/tentacle like actuators feeding parts to their destination are a option.
The streaming of filament in an thermoplastic 3D-printer of today (2017) is a halfway correct analogy. There is streaming of building material but no fusion of streams of discrete building parts.
Less back and forth
Instead of going back and forth for each part one can stream parts directly to the tip of the manipulator.
- from ... -> pick U-turn -> transport-move -> place U-turn -> empty-back-move -> pick U-turn -> ...
- to ... -> U-turn -> place -> place -> ... -> place -> place -> U-turn -> place -> ...
Streaming works only if there is enough space available. Thus only in the higher assembly levels.
The gain in throughput rate should roughly be from two times the length scale of the assembly-level-cell under consideration
to to one time the length scale of the sub-assembly cells.
This gives:
- Two times the convergent assembly step-size from this effect, which is pretty significant.
Less U-turns
In the simple pick and place case one has two tight U-turns of per placement operation where the big manipulator of the assembly cell under consideration has to turn around on the smaller length scale of the sub assembly cells. In the streaming case one has just one tight U turn per row/column (whatever you want to call it) of the product part.
- The number of necessary slowdowns divides by two times the convergent assembly step-size.
Related
- Branching factor
- Math of convergent assembly
- Deliberate slowdown at the lowest assembly level
- Level throughput balancing is an aspect of advanced nanofactory design.
- Higher productivity of smaller machinery
- Limits to lower friction despite higher bearing area
- Convergent assembly & Assembly levels
- Scaling laws
- Pages with math
External links
- Continuity equation
- Leading off-topic: Gauss's law