Difference between revisions of "Upgraded street infrastructure"
From apm
m |
m |
||
Line 14: | Line 14: | ||
* pedestrian security | * pedestrian security | ||
* replacement of structural parts with anchored [[diamondoid balloon products|nitrogen inflated structures]] more then 99% of raw material | * replacement of structural parts with anchored [[diamondoid balloon products|nitrogen inflated structures]] more then 99% of raw material | ||
+ | |||
+ | Air inflated streets may seem ridiculous but nearer inspection shows that sufficient pressure for a "rock hard" surface is easily possible. | ||
+ | Well compartmentalized structures with internal bracings can make surfaces perfectly flat. | ||
[[Category:Technology level III]] | [[Category:Technology level III]] | ||
[[Category:Disquisition]] | [[Category:Disquisition]] |
Revision as of 08:26, 4 April 2015
- solar street pavings with diamondoid solar cells
- energy transmission
- usage of existing gas pipes
- global microcomponent redistribution system
- optical high throughput data link
- coupling to air using micro ships
- coupling to ocean water (desalination)
- semi autonomous self extension
- self repairing streets
- self cleaning - leafes, litter
- handling (removal) of snow and ice
- shearing drive vacuum tube mail
- pedestrian security
- replacement of structural parts with anchored nitrogen inflated structures more then 99% of raw material
Air inflated streets may seem ridiculous but nearer inspection shows that sufficient pressure for a "rock hard" surface is easily possible. Well compartmentalized structures with internal bracings can make surfaces perfectly flat.