Difference between revisions of "Sub-layer"

From apm
Jump to: navigation, search
m (Related)
 
Line 25: Line 25:
 
----
 
----
 
* [[Higher throughput of smaller machinery]]
 
* [[Higher throughput of smaller machinery]]
 +
----
 +
* [[Terminology for spacial places]]

Latest revision as of 10:31, 19 February 2025

As a first result ...

just gives one single sub-layer per assembly level
See: Math of convergent assembly

But one sub-layer per assembly level strongly deviates form proposed designs because
there is motivation to deviate from that for several reasons.
See: Deliberate slowdown at the lowest assembly level

One main reason is optimization for minimal friction.
As it turns out the global minimum for friction is somewhere around n~B³ sub-layers
A bit more accurately With factors more or less near one:
nopt=AA/ATB3C


For details see: Limits to lower friction despite higher bearing area

(TODO: Can this be generalized to sub-level, that is abstracted away from layer geometry?)

Related