The transition time
From apm
Physical
- integration of new upgraded street infrastructure into the present network of asphalt streets
- Transport of non AP products with AP systems Tube mail
- microcomponent recycling of cabins with non AP stuff left in (e.g. potatoe chips)
Societal
(wiki-TODO: add some thoughts)
(TODO: Loads of space for original research here. Not high priority AT though.)