The transition time

From apm
Revision as of 14:28, 14 March 2015 by Apm (Talk | contribs)

Jump to: navigation, search
This article is a stub. It needs to be expanded.

Physical

  • integration of new upgraded street infrastructure into the present network of asphalt streets
  • Transport of non AP products with AP systems Tube mail
  • microcomponent recycling of cabins with non AP stuff left in (e.g. potatoe chips)

Societal

[todo]