Difference between revisions of "Nanofactory math based on continuity of throughput"
From apm
(factored out from page: Limits to higher throughput of smaller machinery) |
(No difference)
|
Revision as of 06:56, 28 August 2022
Pages using equations of continuity for throughput
Level throughput balancing:
Equal throughput across two consecutive gem-gum factory layers.
(former-layer-throughput = next-layer-throughput)
Limits to higher throughput of smaller machinery:
Equal throughput within an gem-gum factory layer.
(assembly-throughout = transport-throughput)