User contributions for Apm
Jump to navigation
Jump to search
18 September 2022
- 09:2709:27, 18 September 2022 diff hist +66 Foldamer robot approach (incremental path) added mode description to graphic
- 09:2509:25, 18 September 2022 diff hist +133 Foldamer printer approach (incremental path) added more description to graphic
- 09:1709:17, 18 September 2022 diff hist +6 m Foldamer printer approach (incremental path) →How would that look like in reality?
- 09:1709:17, 18 September 2022 diff hist −1 m Foldamer printer approach (incremental path) →How would that look like in reality?: fixed link
- 09:1609:16, 18 September 2022 diff hist −10 m Catalysis construction kit approach removed {{stub}}
- 09:1609:16, 18 September 2022 diff hist −10 m Positional assembly redundancy blockade removed the stub template
17 September 2022
- 13:2613:26, 17 September 2022 diff hist +27 m Modular molecular composite nanosystem No edit summary
- 13:2113:21, 17 September 2022 diff hist +318 Positional assembly redundancy blockade →Top down positional assembly: massive improvements
- 13:1913:19, 17 September 2022 diff hist +332 Folded-foldamer pushing approach added section == Relation to the direct path ==
- 13:1613:16, 17 September 2022 diff hist 0 m Folded-foldamer pushing approach No edit summary
- 13:1613:16, 17 September 2022 diff hist +4 m Folded-foldamer pushing approach bulletpoints
- 13:1513:15, 17 September 2022 diff hist +39 N Hierarchical self-assembly Redirected page to Hierarchical selfassembly current
- 13:1413:14, 17 September 2022 diff hist +37 N Iterative selfassembly Redirected page to Iterative self-assembly current
- 13:1313:13, 17 September 2022 diff hist +561 Folded-foldamer pushing approach basic page
- 13:0313:03, 17 September 2022 diff hist +970 N Folded-foldamer pushing approach basic page
- 12:2212:22, 17 September 2022 diff hist +27 m Positional assembly redundancy blockade →Bottom up positional assembly
- 12:2012:20, 17 September 2022 diff hist +2,138 Positional assembly redundancy blockade →Relation of the "positional assembly blockade" to various development path approaches: improved section == Bottom up positional assembly == massively
- 10:4610:46, 17 September 2022 diff hist +22 m Positional assembly redundancy blockade →Relation of the blockade to various development path approaches
- 10:4510:45, 17 September 2022 diff hist +55 Positional assembly redundancy blockade →Relation: extended headline significantly
- 10:4410:44, 17 September 2022 diff hist +336 Positional assembly redundancy blockade →Incremental path - the bockade is present: reformulation and addition
- 10:3710:37, 17 September 2022 diff hist +45 m Positional assembly redundancy blockade →Incremental path - the bockade is present
- 10:3310:33, 17 September 2022 diff hist 0 m Positional assembly redundancy blockade →Relation: capitalization
- 10:2810:28, 17 September 2022 diff hist 0 m Positional assembly redundancy blockade →top down positional assembly: capitalization
- 10:2610:26, 17 September 2022 diff hist +67 Selfassembly level →Related: added * Convergent assembly to hierarchical assembly correspondences
- 10:2510:25, 17 September 2022 diff hist +28 Assembly levels →Related: added * '''Assembly layers'''
- 10:2410:24, 17 September 2022 diff hist +56 Assembly layer →Related: added * Gemstone metamaterial on chip factory - made some bold
- 10:2310:23, 17 September 2022 diff hist +24 Convergent assembly to hierarchical assembly correspondences →Related: added link to selfassembly level
- 10:2210:22, 17 September 2022 diff hist +50 Assembly levels →Related: added * Gemstone metamaterial on chip factory
- 10:2010:20, 17 September 2022 diff hist +46 Convergent assembly to hierarchical assembly correspondences →Related: added * assembly levels – assembly layers
- 10:1910:19, 17 September 2022 diff hist +74 N Convergent assembly comparison Apm moved page Convergent assembly comparison to Convergent assembly to hierarchical assembly correspondences: longer but more descriptive current
- 10:1910:19, 17 September 2022 diff hist 0 m Convergent assembly to hierarchical assembly correspondences Apm moved page Convergent assembly comparison to Convergent assembly to hierarchical assembly correspondences: longer but more descriptive
- 10:1610:16, 17 September 2022 diff hist +3,276 N Convergent assembly to hierarchical assembly correspondences basic page
16 September 2022
- 17:3117:31, 16 September 2022 diff hist +78 Modular molecular composite nanosystem added link to: hierarchical selfassembly
- 17:1817:18, 16 September 2022 diff hist +1 m Catalysis construction kit approach →Related
- 16:5116:51, 16 September 2022 diff hist +3,197 N Positional assembly redundancy blockade basic page
- 16:5016:50, 16 September 2022 diff hist +78 Incremental path →High level map for the incremental path: added link to yet unwritten page: convergent assembly comparison
- 15:3315:33, 16 September 2022 diff hist +2,302 Catalysis construction kit approach major changes
- 14:4114:41, 16 September 2022 diff hist +36 Foldamer robot approach (incremental path) →Related
- 14:4014:40, 16 September 2022 diff hist +1 Foldamer robot approach (incremental path) added paragraph separation
- 14:3914:39, 16 September 2022 diff hist +1,408 N Foldamer printer approach (incremental path) basic page
- 14:2614:26, 16 September 2022 diff hist +969 N Foldamer robot approach (incremental path) Basic page
- 14:0414:04, 16 September 2022 diff hist +55 Incremental path →Degree of directness of the indirect path: added link to: Modular molecular composite nanosystem
- 13:5913:59, 16 September 2022 diff hist +37 Foldamer printer added * Incremental path
- 13:5513:55, 16 September 2022 diff hist +38 Direct path →Related: added * '''Positional assembly'''
- 11:1911:19, 16 September 2022 diff hist +1,222 Termination control improved on the intro
- 10:4110:41, 16 September 2022 diff hist +6 m Termination control →Related: bold
5 September 2022
- 09:4409:44, 5 September 2022 diff hist +40 Level throughput balancing →Related: added * '''Math of convergent assembly'''
- 09:3709:37, 5 September 2022 diff hist +34 Math of convergent assembly →In terms of scaling of volumetric throughput density: added link to Continuity of throughput
- 09:3309:33, 5 September 2022 diff hist 0 m Optimal sublayernumber for minimal friction fixed link
- 09:3009:30, 5 September 2022 diff hist 0 m Gem-gum factory design parameters →On the assembly level throughput parameter: fixed link