Upgraded street infrastructure: Difference between revisions

From apm
Jump to navigation Jump to search
mNo edit summary
mNo edit summary
Line 14: Line 14:
* pedestrian security
* pedestrian security
* replacement of structural parts with anchored [[diamondoid balloon products|nitrogen inflated structures]] more then 99% of raw material
* replacement of structural parts with anchored [[diamondoid balloon products|nitrogen inflated structures]] more then 99% of raw material
Air inflated streets may seem ridiculous but nearer inspection shows that sufficient pressure for a "rock hard" surface is easily possible.
Well compartmentalized structures with internal bracings can make surfaces perfectly flat.


[[Category:Technology level III]]
[[Category:Technology level III]]
[[Category:Disquisition]]
[[Category:Disquisition]]

Revision as of 09:26, 4 April 2015

This article is a stub. It needs to be expanded.

Air inflated streets may seem ridiculous but nearer inspection shows that sufficient pressure for a "rock hard" surface is easily possible. Well compartmentalized structures with internal bracings can make surfaces perfectly flat.